ESCORTS LTD |
---|
We are pleased to inform that M/s Sudha Ventilating Systems Pvt Ltd.
installed 100 Nos. Wind Ventilators on our paint Shop. The results
after installation were very encouraging. There was appreciable drop in
Humidity & temperature, resulting in better working environment. Our
Workers have also appreciated the same. Sanjeev Puri (Head - Plant Engg & Utilities) |
RELIANCE INFRASTRUCTURE THERMAL POWER PLANT |
---|
By considering the today’s scenario of conservation of energy, DTPS have installed and commissioned the TG roof Wind Ventilators, the analysis of effectiveness of Hybrid type Wind ventilators (eCO600) carried out, and found out the benefits of this new technology against existing electrical exhauster.
Pandurang S. Jalkote DGM (O&E) |
NRB BEARINGS LTD. |
---|
M/s Sudha Ventilating Systems Pvt Ltd. installation team visited on
12/5/07 to 14/5/07. They installed all 67 nos. of 14" ventilators at NRB
factory. All ventilators are working satisfactory. Right now NRB observes a temperature drop of 3 deg Cel at shop floor. DS Borude |
SIEMENS LTD. |
---|
M/s Sudha Ventilating Systems Pvt Ltd installed 306 Ventilators. Performance : All units rotating. Temperature has come down by 3-4 degree Celsius. Ambience has improved. Provides natural light. Installation team : Team awarded by Siemens Corporate Health & Safety Department for following good safety practices. Mr Kotwal |
HASTIMAL SANCHETI MEMORIAL TRUST |
---|
Before installation of the ecoPOWER EP600 ventilator, we were facing continuous problem of unpleasant smell in the above rooms due to the closed ventilation duct. However, after installation of the ventilator, we are please to note the following :
We are completely satisfied with the performance of the product and are ready to buy the same again if the need arises. |